Civitas
AI Operations Intelligence
A
Active Jobs
3
6 crews deployed
MTD Revenue
$853K
↑ 12.4% vs prior
Gross Margin
28.3%
↑ 1.8pp
Open Alerts
1
VeriCure anomaly
Data Sources Live
4
VeriCure · Field · UF · NASSCO
Active & Recent Jobs
UPDATED APR 18, 2026 · 09:14
Job IDClientTypeEntity HealthStatusRevenue
VX-2601
City of Austin, TX
1,850 LF · 8" Gravity
CIPP Lining MaxLiner
62
Curing
$148,000
VX-2598
Harris County MUD #23
3,200 LF · 12" Force Main
CIPP Lining United Felts
91
Curing
$267,000
VX-2594
Dallas Water Utilities
24 Structures
Manhole Rehab Field Ops
88
In Progress
$86,400
VX-2589
San Antonio SAWS
980 LF · 8" Sewer
Pipe Bursting Field Ops
100
Complete
$112,000
VX-2583
Bexar County PWD
4,100 LF · 15" Gravity
CIPP Lining United Felts
100
Complete
$342,000
VX-2577
Houston Metro Water
620 LF · 24" Large Dia.
Geopolymer Field Ops
Scheduled
$198,000
Live Data Stream
4 SOURCES · INGESTING
Job
VX-2601
City of Austin · 8" Gravity
Avg Temp (Full Length)
183.4°F
Target: ≥180°F
Pressure
4.2 PSI
Nominal
Elapsed / Est. Complete
3h 22m
Est. complete 1h 14m
⚠ Active Alert
Sta. 8+40
−10.8°F deviation
Distributed Temperature Sensing — Full Pipe Length (1,850 LF)
VERICURE FIBER-OPTIC DTS · VX-2601 · LIVE
TIME →← CURE PROGRESSION DOWNWARD
ELAPSED TIME
0+003+707+4011+1014+8018+50
PIPE STATION (LF)
70°F
210°F
Under-cure Ramp ✓ Cure Zone (≥180°F) Above target
AI INSIGHT
NASSCO × VeriCure Correlation Detected
VeriCure is detecting a persistent −10.8°F temperature deviation at Station 8+40 during the cure hold phase. This station correlates exactly with a Grade 4 joint separation recorded in the pre-lining NASSCO PACP report — a known infiltration entry point.

Groundwater infiltration is cooling the liner at this station before the resin can fully cross-link. Without intervention, this section risks under-cure and early structural failure within 2–3 years.
NASSCO Defect Code
JSS — Joint Separated (Severe)
NASSCO Grade
Grade 4 (Significant)
Station
8+40 (455 LF from start)
Recommended Action
Extend hold +45 min · Raise water temp to 195°F
AI Alert Feed
3 ALERTS
Bid Parameters
Project Details
Pipe Specs (from NASSCO Report)
Site Conditions
📐
Enter NASSCO condition data and project specs.
Generate Bid for a fully priced estimate with AI risk scoring.
Total Bid Value
$182,248
Suggested range: $175,000 – $195,000
71%
Est. Win Probability
Liner Specification
Liner Type10" CIPP, 7.5mm wall (ASTM F1216)
SourceUnited Felts — Wet-out delivery
Quantity2,640 LF incl. 10% contingency
ResinStyrene-free vinyl ester, 18,480 lbs
Cure MethodHot water inversion — est. 4.5h cure
Cost Breakdown
Material (liner + resin)$68,200
Labor (4-person crew)$43,200
Equipment (inversion unit + CCTV + bypass)$22,800
Mobilization / Demobilization$8,400
Overhead + Margin (28%)$39,648
Total$182,248
AI Risk Assessment
Change Order Risk
Medium — 34%
Cure Complexity
Standard
Material Waste Risk
Low — 4%
Historical Comparison (Similar Jobs)
Based on 11 similar jobs in TX municipalities · Avg actual: $178K · Avg win rate: 71%
AI Bid Assistant
POWERED BY CIVITAS HISTORICAL DATA
Documents Complete
7
of 14 required
Awaiting Lab Results
2
ASTM D790 · D638
Est. Package Ready
Apr 24
Post-cure CCTV pending
Auto-Generated
4
Docs drafted by AI
Compliance Checklist — VX-2601
City of Austin · CIPP 8"
Package Completion50%
Municipal Compliance Package
VX-2601 · CITY OF AUSTIN, TX · AUTO-ASSEMBLED BY AI
Pre-Installation
Pre-lining CCTV Report (NASSCO PACP)✓ Attached
NASSCO Overall Condition IndexOCI 64 — Moderate (Grade 3)
Defects Coded12 defects · Highest: Grade 4 JSS at Sta. 8+40
Bypass Plan✓ Approved
Liner Material Submittal (United Felts)✓ Batch #UF-2601-A
EnviroCure Liner MSDS✓ Attached
ROW Permit✓ Permit #ATX-2601-R
Installation & Cure Documentation
VeriCure DTS Cure Log (Full Length)✓ Live · Generating
Cure Start / Target / Elapsed06:00 AM · ≥180°F · 3h 22m
⚠ Anomaly — Sta. 8+40Extended cure protocol active
Field Daily Report✓ Submitted (Crew Alpha)
Bypass Pump Log✓ Live · 52 PSI
Post-Installation (Pending)
Post-Cure CCTV (NASSCO PACP)⏳ Scheduled Apr 22
ASTM D790 Flexural Strength Test⏳ Sample at lab · ETA Apr 23
ASTM D638 Tensile Test⏳ Sample at lab · ETA Apr 23
Quality Certificate (AI Auto-Generated)⏳ Awaiting ASTM results
As-Built Package (AI Auto-Generated)⏳ Awaiting post-cure CCTV
Permit Closure Submission⏳ Target Apr 25
What gets auto-generated when data arrives
Once post-cure CCTV and ASTM lab results are received, the platform automatically assembles and populates: the VeriCure quality certificate (with full DTS log appended), the NASSCO as-built, and the City of Austin permit closure package — formatted to Austin PW specifications. No manual assembly required.