Integrity / Pipeline Platform · Ridgeline · powering Ridgeline Midstream
Demo · last ILI ingest 11 min ago Operator view JT

Pipeline portfolio · Q1 2026

2,400 miles monitored across gas transmission and hazardous liquid. Risk scores updated daily.
Miles · monitored
2,400
12 segments · gas + liquid · 6 states
Anomalies surfaced · Q1
847
14 Class A · 142 Class B · 691 Class C/Monitor
Interventions · leaks prevented
3
Critical dig-ups · Q1 · all before regulatory deadline
Composite risk score
78/100
Industry avg 65 · top quartile

Pipeline network · risk-colored segments

Low risk Watch Elevated
TEXAS LOUISIANA MISS. ALABAMA AN-14289 MP 67.4 · Class A
All · 12 Gas · 7 Liquid · 5 Elevated · 1 Watch · 3
Segment · Name Service Miles Last ILI Anomalies Risk Status
Demo note. Click any segment to drill into the risk breakdown, anomaly log, and ILI history. PL-047 Ridgeline Mainline East is the hero — 142 miles, 18 years old, AN-14289 requires dig within 5 days.
Back to portfolio

Ridgeline Mainline East

PL-047 · Natural gas transmission · 142 miles · installed 2008 · MAOP 1,440 psig
Ridgeline Midstream · TX → MS
Composite risk
82/100
Elevated · act now · +6 pts vs last quarter
Anomalies · this segment
142
3 Class A · 14 Class B · 125 Class C
Next scheduled ILI
Aug 2026
MFL + caliper · Tuboscope · 6-yr re-inspection cycle
Risk breakdown
Anomalies 142
ILI history 5
Line profile

Risk factor decomposition

Age & vintage72/100
Installed 2008 · approaching 20-year vintage threshold · coating cohort flagged
Pressure cycling68/100
3.2 cycles/day avg · increased last 6 months from 2.1 · fatigue risk elevated
Corrosion progression84/100
Coating disbondment accelerating MP 65–72 · external corrosion signatures
3rd-party interference32/100
811 calls within norms · ROW encroachment: 2 minor events Q1
Geohazard exposure58/100
Sabine River crossing at MP 94 · strain gauges installed 2024
Inspection recency45/100
Last ILI Feb 2026 · next due Aug 2026 · within 6-yr re-inspect window

Next-step decisions

Immediate · Class A
AN-14289 · metal loss 38% · MP 67.4
PHMSA 49 CFR 192.933 · dig-up within 5 calendar days · contractor assignment pending
Within 60 days · Class B
14 anomalies · Class B
Grouped into 6 dig programs · integrity-engineer review this week
Model recommends
Cathodic protection survey · MP 60–75
Coating disbondment signature suggests CP shortfall · unscheduled survey recommended before next pressure test
PHMSA 49 CFR 192 / 195 obligations baked in. Every Class A triggers a 72-hour notification workflow. Every dig program ties evidence back to the NOPV audit trail. This integrates directly with AG.13 Regulatory Intelligence.

Anomaly log · portfolio-wide

Every anomaly from every ILI run. Classified, prioritized, tied to obligations.
All · 847 Class A · 14 Class B · 142 Metal loss · 421 Dent · 188 SCC · 56
Model-assisted classification. Every anomaly is auto-classified per PHMSA criteria and sense-checked by the integrity engineer. The model routes critical findings ahead of the 90-day review cycle.

Risk model · methodology

Six-factor composite score. Updated daily from ILI, SCADA pressure data, 811 calls, and CP surveys.
Input signals
6
Age · pressure · corrosion · 3rd-party · geohazard · inspection
Refresh cadence
Daily
SCADA every 15m · ILI on ingest
False-positive rate
3.4%
Back-tested Q4 2025 vs dig outcomes

What goes in · what comes out

The composite score blends six signals that a senior integrity engineer weighs manually today. We don't replace the engineer — we give them a prioritized list on a Monday morning instead of 847 rows in a spreadsheet.

Every score links back to source ILI data, SCADA pressure history, and the obligations matrix. Engineers can override; overrides are logged as training data.

Output: (1) daily risk score per segment, (2) Class A/B/C auto-classification per anomaly, (3) prioritized dig list with PHMSA-deadline-aware sequencing.

Inspection schedule · next 12 months

Planned ILI runs, CP surveys, and pressure tests. Model flags unscheduled inspections when risk drift warrants.
Target window
Segment · tool
Type
Status
May 2026
PL-047 Mainline East · CP survey MODEL-FLAGGED
Unscheduled
Pending
Jun 2026
PL-038 Gulf Coast Gas · MFL · Tuboscope
Planned ILI
Contracted
Aug 2026
PL-047 Mainline East · MFL + caliper · Tuboscope
Scheduled ILI
Contracted
Sep 2026
PL-052 Mainline West · pressure test
Planned
Confirmed
Nov 2026
PL-071 Alabama Trunk · UT · Rosen
Planned ILI
Bid stage
Feb 2027
PL-041 North Texas Gathering · MFL baseline
Planned
Draft